Rav

About Rav Singh

This author has not yet filled in any details.
So far Rav Singh has created 21 blog entries.

Wet weather slip:(

After a great start to the year mother nature stepped in and we got stuck in the mud. These are the standings as of July 27th. Thanks for the info Jack! 1 – Lakeside - 39.5 2 – Bearspaw – 39.0 3 – Silver Springs - 37.0 4 – Wintergreen - 31.5 5 – Willow Park - 26.5 6 - Pinebrook #2 - 23.0 7 - Olds 22.5 8 - Woodside - 21.0

By |May 11, 2014|

Pro Shop Update

The Pro Shop - Golf Central! • Friendly and courteous staff • A complete line of Callaway Golf Equipment and Accessories • Technical and Stylish Weather Gear by Sun Ice, Second Skin, and North Face • Great selections in Men’s Apparel from Callaway, Puma, Greg Norman,AUR, Sun Ice, Antigua, Foot Joy and others . ECCO new for 2014 •Ladies golf fashions from AUR, Cracked Wheat, Lopez and others • Professional Golf Instruction • Gift Certificates From complete sets of clubs right down to your last minute needs – the Wintergreen Pro Shop has you covered. Golf Lessons Our CPGA Certified golf

By |April 29, 2014|

Green’s Committee Report Apr 2014

Greens Committee Report April 14, 2014 Projects/ Visible Improvements 1. New paving #10 Tee and around Caddy Shack 2. New Trees #8 3. Continue with Bunker Sand Replacement 4. New Rain/Lighting Shelter #12/#13 intersection (Tentative) New Facility Equipment 1. Toro Workman Utility Vehicle 2. 2 Club Car Utility Carts 3. John Deere Aerator 4. Patio Furniture Club house 5. New Irrigation Pump house VFD Conversion 6. New Driving Range Ball Washer Course Conditions After a considerably long and cool winter the course has wintered on the positive side with the hard work of our year round staff. All greens

By |April 24, 2014|

Green’s Committee Proposal’s for 2014

Driving Range Tee Enhancement Driving range tee deck is in need of major repairs.  The current tee deck system is 10 years old. This project would give the driving range an overall face-lift, as it is one of the weakest areas in the golfer experience at Wintergreen.  The project would include a new hitting surface that is low maintenance, new range balls, smaller 3-4 foot fencing around the perimeter of the landing area to minimize lost range balls. Golf instruction area that is separate from main hitting tee  2.   Apron / Collar / Tee Deck Resurfacing  The #1 apron

By |August 2, 2013|

Green’s Committee Report Jul 2013

Greens Committee Report July 31, 2013 Projects for August 1. New fountain install #15 pond 2. Paving Repairs Caddy shack surrounds 3. Tree replacement #8, #10 (9-10ft trees) 4. Continue with Bunker Sand Replacement #11 Front green bunker 5. New White Spruce Trees Course Conditions Although weather has been hit and miss through the month of July the course and crew did hang in there. Drainage work done over the last 5-6 seasons did move the moisture allowing the course to dry at an acceptable rate. New bunker sand has been ordered and we will start replacing the sand

By |July 31, 2013|

Green’s Committee Report Jun 2013

Greens Committee Report June 12, 2013 Projects for June & July 1. New fountain install #15 pond 2. Paving Repairs 3. Tree replacement #8, #10 (9-10ft trees) 4. Drainage install #11 apron, #6 & #8 cart paths 5. Continue with Bunker Sand Replacement currently working on #18 left green side New Facility Equipment 1. New commercial fridge in kitchen 2. New ice maker in kitchen 3. New pressure washer for cart pad 4. Cedar restaurant sign for at bridge 5. New Vinyl flooring in kitchen Course Conditions The greens committee is happy with current course conditions considering the amount

By |June 12, 2013|

Board Meeting Apr 2013

Wintergreen Golf Society - Board Meeting Minutes Date:                                   30 April 2013 Time Started:                     1800 Time Completed:              1950 Location:                            Board Room, Wintergreen Present:                             Kathy Whitburn  , Rav Singh, Ron Carter, Ron Peiluck, Kirby Smith    Hal Gardiner, Tim Houghton, Alf Beaudry, Walt Blackstaffe Absent:                               Brett Zufelt   Quorum:                             Declared (Majority of voting board members)   Thanks to Walter for providing soft drinks and sandwiches   Agenda: Old Business Minutes of Board meeting of September 19, 2012 Minutes accepted for September and January Green’s Committee Report Written report presented by Rav and accepted. Ron P is currently completing

By |April 6, 2013|

Greens Committee Report

Members: Rav Singh Alf Beaudry Chris Bach Ron Peiluck Course Comparables This year we have revised the approach and process on comparing Wintergreen to other courses keeping golf fundamentals the primary focus. Our goal is to make this process enjoyable and productive for those participating with the final outcome benefiting Wintergreen golf facility, Members and their guests. Our goal is to put together a 5-year plan for improvements required to the golf course by using the information gathered from the four comparable golf courses. This is a unique place and must be treated as such. Mountain type course Has

By |April 29, 2012|